Why choose postech piles?

 At Postech we are working to give you a product, and installation that are guaranteed. The excellence of our products is the assurance of your complete satisfaction. Your expectations and ours are the same, that's why we do not hesitate to guarantee the installation of our piles against movement due to frost.


Here are the main advantages which contribute to the ever-growing success of this technology:

  • Materials and installation are supplied - You don't have to do a thing, simply identify the site!
  • Fast installation, generally without excavation (no damage to land site);
  • Construction can begin as soon as the piles are installed;
  • They may be installed beneath existing structures;
  • They are reusable (we can un-screw and re-install them);
  • They are adjustable : After the pile's installation, a supporting head is added, which fits into the pile shaft, and allows for level setting (up to six inches);
  • Possibility of adding length to the pile by means of an extension which is fastened by a sleeve coupling;
  • Excellent price/quality value;
  • Different blade dimensions allow for adjustment to different soil types ans load bearing requirements;
  • May be installed regardless of temperature;
  • May be installed in soil where water table is near surface;
  • May be installed near water without causing soil erosion.

The concrete column foundations (sonotubes) appear paltry when compared to the numerous advantages and flexibility that our product offers.
Postech Piles offer a solid and durable foundation, without the problems inherent to the methods of traditional concrete foundations:

Postech piles

 

Concrete-poured foundations

No atmospheric condition limitations except frozen soil.   Limited to dry periods and temperatures above freezing point.
Reusable.   Non-reusable.
Reduced costs, reduced delays. No land site damage.   Excavation required, land site damage, long delays.
Minimum equipment, easy handling. One man job - most of the time.   Multiple pieces of equipment, more than one on site worker.
Clean, no excavation needed for auger-driving operation.   Leftover soil, excavation is required, Heavy concrete mixers - damage to lawn and asphalt driveways.
One piece of equipment, fast guaranteed installation.   Excavation, formwork, concrete and many hours for installation. Often no guaranty.
Build site planning is reduced to dropping markers for exact location and desired height.   A full time on site manager to plan operations and direct work.

 

No more excavating, concrete, delays due to weather, heavy machinery... Say goodbye to your hassles!