AREAS OF APPLICATION

commercial / Industrial

Saving time and money

Eager to offer quality services and meet established deadlines, contractors are expected to make smart choices when it comes to the materials used in building foundations. The Postech solution is the right choice to fulfill these needs.

Thanks to Postech, time loss due to traditional concrete pilings that require the involvement of numerous subcontractors, as well as the long curing period before further construction can be eliminated. Installed below the frost line, augered pile guarantee unsurpassed stability. They can be adapted to all types of projects: warehouse foundations, commercial greenhouse construction, stabilizing a sunken building, reservoir protection, signs and publicity panel support, etc.

The possibilities are endless.

Specialized machinery allows for the installation of augered pile inside commercial and industrial buildings and, thanks to its electric motor, without toxic fumes or curing time.

DID YOU KNOW THAT...?

  • Augered piles installation does not require excavation or poured concrete. Construction work can begin immediately after installation.
  • Piles can be installed in any weather.
  • The size of the piles and number of helices are determined by the soil type and the load it needs to support.
  • Building contractor's site planning is limited to merely placing markers where the post are to be installed and determining the desired height.